SITEPAPERS RAMS · CPP · Tenders
Written for you
The Site Pack · £349

Walk onto a managed site with every paper in order.

Starting on your first managed site, or stepping up to bigger contracts where the paperwork gets checked properly? The Site Pack is three bespoke RAMS for your core tasks, a CDM 2015 construction phase plan and five toolbox talks, all written for your jobs and reviewed by an SMSTS qualified site professional. One intake, one price, 72 hours.

72 hour turnaround · one revision round per document · PDF + editable Word

§ 01

What you get, itemised honestly

ItemBought separately
Three bespoke RAMS, one per core taskYour three bread-and-butter tasks, each written as a full standard RAMS: hazards, 5×5 risk assessment, method statement, COSHH, PPE, emergency arrangements and briefing record. 3 × £89£267
Construction Phase Plan, CDM 2015Required on every construction project, including domestic jobs. Dutyholders, site rules, welfare, key phase risks, fire and emergency, proportionate to your work. £199£199
Five toolbox talks, matched to your tradeShort, briefable talks with sign-on sheets, chosen to fit your tasks: for example working at height, manual handling, silica dust, hand-arm vibration, housekeeping and fire. Only available inside the pack, not sold separately. Pack onlyincluded
Itemised total£267 of RAMS plus a £199 phase plan is £466 before the toolbox talks are counted at all.  £466+
Site Pack priceOne intake covering all your jobs, every document reviewed and signed off by an SMSTS qualified professional, delivered together within 72 hours. 72h£349
The saving is real because the work overlaps: one intake, one site picture, one review. That efficiency is yours, not padding removed.
§ 02

Who the pack is for

The Site Pack exists for one moment: the week a principal contractor says "send your paperwork over before you start". If you have been working on word-of-mouth domestic jobs and are moving onto a managed site, or pricing bigger contracts where the pre-start checklist is longer than the quote, this is the fastest way to arrive with everything in order.

It suits a subcontractor whose work falls into a handful of repeatable tasks. A plasterer might take skimming, boarding and external render as their three RAMS. An electrician might take first fix, second fix and testing. The phase plan covers the project you are walking onto, and the toolbox talks give you a briefing record to run week by week, which is exactly what site managers ask about after the RAMS are approved.

It is not a shortcut around the thinking. You still complete one proper intake about your tasks and the site, and every document is written from those facts and reviewed before it ships. If one of your three tasks is complex or high-risk, we will tell you at intake if it needs the £139 treatment and agree any difference before work starts, not invoice you after.

§ 03

Straight answers

One pack, one intake, five working documents and a set of talks. Everything bespoke, everything reviewed, nothing generic. If your situation does not fit the pack, order the documents individually or ask us first via the contact page.

£466+ of documents for £349

One intake. Three RAMS, a phase plan and five talks, back in 72 hours.

Order the Site Pack, £349